Sung Wong Toi Station Pedestrian Link
About the Project
In order to provide a direct dedicated connectivity from south-eastern end of existing SUW concourse to Pak Tai Street, a Pedestrian Link comprising a new underground lobby and a long span footbridge to be provided for the railway passengers and pedestrians to cross Sung Wong Toi Road and Olympic Avenue.
BIM Scope of Work
- Multi-Disciplinary BIM Modelling, Coordination, and Drawing Production for all disciplines, including underground service network, excavation, temporary and permanent works.
- Rendered Walkthrough Animations of the Project
- Construction Simulation of the Construction Works
- Method Statement of the Concourse Breakthrough
- Temporary Traffic Management Schemes
Project Information
- Area – TBC
- Duration – 4 Years
- LOD – 500
- Client – Arup