Integrated Waste Management Facility Phase 1

About the Project

The IWMF will be developed in phases. The IWMF Phase 1 will have a treatment capacity of 3,000 tonnes each day. It will adopt advanced incineration as the core treatment technology as well as a demonstration-scale mechanical sorting and recycling facility for the recovery of useful resources from the mixed MSW.

Virtual Design and Construction Services

  • Joint-Venture BIM Manager and BIM Consultant
  • Multi-Disciplinary BIM Coordination and Model Federation
  • Project BIM Execution Plan
  • Digital Project Strategy Advisory and Consulting
  • MEPF Modelling and Coordination
  • Combined and Individual Service Drawing Production

Awards

Gold – HKIBIM Awards 2021

Project Information

  • Area – 16 Hectares
  • Duration – 5 yrs.
  • LOD – 500
  • Client – Environmental Protection Department of the HKSAR
  • Contractor – Keppel Seghers – Zhen Hua JV
  • Project Cost – HKD 31 billion
Integrated Waste Management Facility Phase 1 - overall site bird’s eye
Integrated Waste Management Facility Phase 1 - overall site bird’s eye
Integrated Waste Management Facility Phase 1 - overall site SIDE VIEW
Integrated Waste Management Facility Phase 1 - overall site SIDE VIEW
Integrated Waste Management Facility Phase 1 - ALL FEDERATED MODEL
Integrated Waste Management Facility Phase 1 - ALL FEDERATED MODEL
Integrated Waste Management Facility Phase 1 - ALL FEDERATED MODEL
Integrated Waste Management Facility Phase 1 - overall site AERIAL VIEW
Integrated Waste Management Facility Phase 1 - ALL FEDERATED MODEL
Integrated Waste Management Facility Phase 1 - ALL FEDERATED MODEL