Hongkong International Airport 3RS Projects

Terminal 2 Expansion, Intermodal Transport Terminal Bonded Bridge, Automated People Mover System and Baggage Handling System

Terminal 2 Expansion

The works include expansion of the Terminal 2 building, an annex structure, interconnecting bridges, landside transport facilities including viaducts and at-grade roads, underground utility services, footbridges and modification works to existing facilities at Hong Kong International Airport (HKIA). The provision of building services and airport systems also form a major part of the scope.

Scope of Work

  • Underground Service Modelling and Coordination
  • Viaduct Civil 3D Modelling and Documentation
  • ABWF Modelling and Coordination

APM Systems

Building a new, 2,600-metre-long Automated People Mover (APM) system that will connect Terminal 2 with the new T3 Concourse. The new APM system will operate at a top speed of 80km/h and transport up to 10,800 passengers per hour.

Scope of Work

  • Existing APM Systems under Terminal 1
  • Existing APM Depot Reconfiguration
  • New APM Line from T2 to T3
  • Laser Scanning
  • APM System Modelling and Documentation
  • 4D Construction Sequences
  • 4D Method Statements

Intermodal Transport Terminal Bonded Bridge

The ITTBB is situated between the Hong Kong-Zhuhai-Macau Bridge Hong Kong Port (HZMB HKP) and the Intermodal Transfer Terminal (ITT) adjacent to the SkyPier and serves as a dedicated direct vehicular access connecting the ITT of the Hong Kong International Airport (HKIA) and the HZMB HKP

Scope of Work

  • Tender Construction Sequence Animation
  • Pier and Deck Modelling
  • Abutment and Surface Network Modelling

HKIA TERMINAL 2 EXPANSION
HKIA TERMINAL 2 EXPANSION
HKIA TERMINAL 2 EXPANSION - SMOKE CURTAIN
HKIA TERMINAL 2 EXPANSION - SMOKE CURTAIN
HKIA TERMINAL 2 EXPANSION - BAFFLE CEILING STRUCTURE
HKIA TERMINAL 2 EXPANSION - BAFFLE CEILING STRUCTURE
HKIA TERMINAL 2 EXPANSION - BAFFLE CEILING STRUCTURE CORNER VIEW
HKIA 360 APM
HKIA 360 APM
HKIA 360 APM - AIS Station Render
HKIA 360 APM - AIS Station Render
HKIA TERMINAL 3
HKIA TERMINAL 3
HKIA TERMINAL 3
HKIA TERMINAL 3
AAHK INTERMODAL BONDED BRIDGE - ARCHITECTURE RENDER
AAHK INTERMODAL BONDED BRIDGE - ARCHITECTURE RENDER
AAHK INTERMODAL BONDED BRIDGE - ARCHITECTURE RENDER
AAHK INTERMODAL BONDED BRIDGE - ARCHITECTURE RENDER
AAHK INTERMODAL BONDED BRIDGE - ARCHITECTURE RENDER
AAHK INTERMODAL BONDED BRIDGE - ARCHITECTURE RENDER
AAHK INTERMODAL BONDED BRIDGE - ARCHITECTURE RENDER
AAHK INTERMODAL BONDED BRIDGE - ARCHITECTURE RENDER